Today the demolition continues. I had already brought down the roof for the most part, knocking out the front board and the side walls enough so that the roof came down at the front. I also started breaking up one of the side walls as well as picking up branches and other small brush and burning it up in the drum while dragging larger weed trees to the burn pile site. Today was no different, just a continuation of the same. I did manage to get one wall completely broken up with some boards taken to a staging spot next to the storage trailer for further breakup into usable boards.
The other side wall was split up board by board until I could get to where I could knock boards loose with the sledgehammer. Some of these boards were salvaged and staged with the rest while a lot was thrown into the burn can, keeping a nice little fire going, something that would've been welcome in the winter time. I continued to chop down large weed trees, dragging them to the burn pile and piling everything up. On top of that the old OSB board that came from the one side wall I took down today was tossed. I'll probably end up having the whole site cleaned up by the end of the week but will have the salvage pile to contend with going into next week. So far so good.
0 Comments
Leave a Reply. |
Archives
May 2023
|